Pievienot darbus Atzīmētie0
Darbs ir veiksmīgi atzīmēts!

Atzīmētie darbi

Skatītie0

Skatītie darbi

Grozs0
Darbs ir sekmīgi pievienots grozam!

Grozs

Reģistrēties

interneta bibliotēka
Atlants.lv bibliotēka
2,49 € Ielikt grozā
Gribi lētāk?
Identifikators:441874
 
Vērtējums:
Publicēts: 03.11.2005.
Valoda: Angļu
Līmenis: Vidusskolas
Literatūras saraksts: Nav
Atsauces: Nav
Darba fragmentsAizvērt

From the above and also on our earlier discussion about TOC, it would seem that the two are in conflict with each other since ABC assumes most costs to be variable whilst TOC assumes most costs to be fixed. However, it should be noted that the nature of the two are different in the first place. ABC is actually a long-run cost management tool that considers all costs to be variable in the long run while TOC is more oriented towards the short run and therefore considers most costs to be fixed. Thus depending on the time horizon, ABC may suggest a particular course of action while TOC may imply another. It is possible to integrate the two methods together to better yield information that is useful to management. To determine when TOC should be used, management could consider the type of problems that it faces. If the problem relates to throughput and variable costs, TOC may be appropriate.
In summary, TOC requires less data and effort than ABC and is far easier to implement and operate.

Parādīt vairāk līdzīgos ...

Atlants

Izvēlies autorizēšanās veidu

E-pasts + parole

E-pasts + parole

Norādīta nepareiza e-pasta adrese vai parole!
Ienākt

Aizmirsi paroli?

Draugiem.pase
Facebook

Neesi reģistrējies?

Reģistrējies un saņem bez maksas!

Lai saņemtu bezmaksas darbus no Atlants.lv, ir nepieciešams reģistrēties. Tas ir vienkārši un aizņems vien dažas sekundes.

Ja Tu jau esi reģistrējies, vari vienkārši un varēsi saņemt bezmaksas darbus.

Atcelt Reģistrēties